Shantou · China +86 133 6387 9944 ISO 9001 · EU 10/2011 · RoHS joe@8pck.com
Shantou · China · Since 2011

Custom Plastic Bottles From Shantou — Stock Moulds, or a Mould of Your Own

PET, HDPE and PETG bottles, jars and airless packs from our partner factory, CXWN in Shantou — 3,000+ stock moulds with no tooling, 1,000 pcs per colour — or a new mould, paid once and owned by you, from USD 850.

ISO 9001:2015 MOQ 1,000 pcs 25–35 days EU 10/2011 RoHS
Reply within 1 business daySamples in 7 daysNo tooling cost on 3,000+ moulds
PET jars and bottles on the shelf
Pumps and closures, colour matched
Blow moulding hall in Shantou
Bottles · closures · blow moulding — Haojiang, Shantou
7,800+ m²Factory
20Lines running
3,000+Moulds in stock
40+Export markets
✓ ISO 9001:2015
✓ EU 10/2011 migration test
✓ RoHS verification
✓ MOQ 1,000 pcs
✓ 25–35 day lead time
Same plant, more formats

Tubes, Lipstick and Straw-Fibre Bottles

Beyond bottles and jars, the same factory extrudes tubes and moulds lipstick cases — useful when one brand needs a whole shelf set.
From pellet to pallet

How a Custom Order Runs, Step by Step

No step leaves the building. Resin comes in, cartons leave.
Blow moulding
Silkscreen and assembly
Inline QC
  1. 01Resin intake & dryingMoisture checked per batch
  2. 02Blow mouldingWall thickness and weight sampled hourly
  3. 03Injection mouldingNeck dimensions gauged per cavity
  4. 04DecoratingPrint adhesion tape test
  5. 05Assembly & leak testEvery pump cycled before packing
  6. 06Packing & loadingDrop test and carton count before sealing
How a custom project runs

What Each Stage Actually Takes

Quoted lead time is the day the container leaves Shantou, not the day we start.
01Brief2 days
02DFM & 3D5 days
03Quotation+2 days
04T1 sample25 days
05Production30 days

Is Your Pack More Than One Piece?

Four parts, two seals and a gold finish change the tooling plan. Start with the multi-part guide.

Compliance on file

Certificates You Can Check Yourself

Ask for any of these and we send the signed PDF the same day.
ISO 9001:2015
EU 10/2011
RoHS
Migration test
Certificate pack (PDF)

ISO 9001:2015, RoHS verification and the EU 10/2011 migration test, in one PDF.

Request the Pack →
Recent shipments

What Shipped This Year

Customer names withheld. Volumes and lead times are actual.
MarketVolumeItemLead time
Germany50,000 pcs500 ml PET pump bottle32 days
UAE · Dubai20,000 pcs250 ml PET food jar28 days
United Kingdom15,000 pcs30 ml airless bottle30 days
Vietnam100,000 pcsHDPE shampoo bottle35 days
Trends desk

PPWR Is Already in Force. What Changes for a Bottle Buyer This Year?

Regulation (EU) 2025/40 has applied since 12 August 2026. The deadlines that matter for cosmetic packaging are not the ones in the news — they are the design and labelling dates just behind them.

All Trends →

See the Plant Before You Send a Drawing

Three minutes of blow moulding, the mould room, printing and QC — filmed at CXWN in Shantou.

▶ Watch the Factory Film
Who we supply

Who We Supply

Most of our work is repeat orders on stock moulds; the occasional new shape is the exception.

Distributors

Packaging distributors in the US, UK, Germany, France, Australia and the Gulf who keep stock and need a factory that can repeat a colour exactly. We quote per SKU with packing data, so the freight calculation is yours, not a guess.

Brand Owners

Independent skincare, haircare and personal-care brands ordering 1,000–20,000 pcs. One mould, one colour, one label — usually with a silkscreen or a spray coat that makes a stock bottle read as bespoke.

Contract Manufacturers

Fillers who buy for several brands at once and need the same bottle in three colours, delivered on a schedule that matches their line. Mixed containers are normal for us.

What We Do Not Do

We do not fill, formulate, design labels, or handle hot-fill above 60 °C in PET. We do not claim FDA, REACH or GRS certificates we do not hold.

Saying this up front saves a sample round: if your product needs a heat-set bottle or a fill line we would have to subcontract, we will tell you before you send a deposit.

How to verify us →

Buyer questions

What Buyers Ask Before the First Order

Short answers. The long versions are in the guides.
What is the minimum order quantity?

1,000 pcs per colour on an existing mould. Below that we quote stock colours from inventory.

Is there a tooling cost?

No on the 3,000+ moulds CXWN already holds. A new blow mould starts at USD 850 and takes 15–20 days.

How long does production take?

25–35 days after sample approval for stock colours; custom colours and heavy decoration add 5–7 days.

Can I get a sample first?

Yes — samples from existing moulds are free, courier collect, and leave within 7 days.

Who issues the contract and invoice?

The factory: Shantou Chuangxin Weinuo Plastic Packaging Products Co., Ltd. (CXWN). 8PCK is the English export desk; payment goes to CXWN.

Which compliance documents do you hold?

ISO 9001:2015 (PCC85724Q01277R1S), RoHS reports for PE and PET, and an EU 10/2011 + 1935/2004 migration test on PE grades. Scans are on the quality page.

Can you match a specific colour?

Yes, to a Pantone reference. Colour matching is quoted per colour and the 1,000 pcs MOQ applies per colour.

Which markets do you ship to?

40+ countries, mainly the US, EU, Southeast Asia and the Middle East. Terms are EXW, FOB or CIF.

Request a quote

What We Need to Quote

Tell us the bottle and the quantity. You get price, lead time and a sample plan within one business day.

Reply within 1 business dayNo marketing emailsYour drawing stays private
Factory entrance

Or write directly: joe@8pck.com · WhatsApp

QUOTE ✆
WhatsApp Get a Quote →