Shantou · China +86 133 6387 9944 ISO 9001 · EU 10/2011 · RoHS joe@8pck.com
Home / Products / 2.5 ml Dropper Oil Bottle

2.5 ml Dropper Oil Bottle, and Why the Closure Is Where It Fails

2.5 ml Dropper Oil Bottle — 2.5 ml, PET / glass, screw cap with dropper. MOQ 1,000 pcs per colour, samples in 7 days, production 25–35 days.

2.5 ml Dropper Oil Bottle — representative image

Representative image — exact dimensions, colour and finish are confirmed on the approved drawing.

Capacity2.5 ml
MaterialPET / glass
ClosureScrew cap with dropper
Neckon request
MOQ1,000 pcs per colour
Lead time25–35 days

Not sure the neck fits your pump? Run the spec checker →

Why This Size Exists

At 2.5 ml the pack is a sample: it has to look like the full-size product while costing a few cents.

Where It Is Used

Typical buyers: essential oil samples and testers. The pack is usually chosen first by the filling line and second by the shelf: the closure decides how it fills and how it dispenses, and the label follows.

What the Closure Changes

Screw cap with dropper — the closure is what fails first in the field, so it is tested on the pack rather than supplied loose.

What to Send in a Brief

Capacity, closure type, quantity and the product's viscosity. Those four lines are enough to quote with packing data.

Compatibility, Packing and Tolerance

Closures That Fit

Send the neck finish and we match a closure from the same plant: disc-top and flip-top caps, lotion and foam pumps, mist sprayers and droppers. Closures are fitted and tested on the bottle before packing, which is where most leaks originate.

Packing and Freight

Carton quantity, carton dimensions and gross weight are quoted with the unit price. FOB Shantou is the default term; EXW and CIF are quoted on request. Payment is 30 % deposit, 70 % against the bill of lading.

Tolerance

Dimensions hold to ± 1.5 % and weight to ± 1 g against the approved drawing. Anything outside that range is remade, not discounted.

Decoration Options and What They Cost in MOQ

Silkscreen in one to four colours starts at 1,000 pcs and adds about five days; the plate is a one-off, which is why it does not repeat on a reorder. Labels are lower in unit cost for multi-colour artwork and allow short runs. Hot stamp, spray coat and metallising start at 3,000 pcs because the line set-up is heavier and the reject rate is higher.

Decoration also decides the recycling story. A paper label with a wash-off adhesive keeps a PET bottle in the PET stream; a full-body sleeve does not. If the pack carries a recyclability claim, the decoration is part of the claim, not a design detail.

Sampling and Approval

A sample from an existing mould takes 7 days and comes from the production tool, not a showroom piece. For a new shape, tooling takes 15–20 days before sampling. We ship the sample with the drawing it was made to, so the approval is against a number rather than a photograph.

If the formula contains alcohol, a high level of essential oil or a particulate, say so at sample stage — the compatibility test runs four weeks and it costs less to find a problem then than in a container.

How We Quote and Ship

Send capacity, neck, quantity and the closure you intend to use. We reply within one business day with unit price, packing data (pcs per carton, carton size, gross weight) and lead time — the packing data is what your freight forwarder needs, so it is quoted with the price rather than after.

Production is 25–35 days after sample approval on existing moulds, 15–20 days longer if a new mould is needed. Payment is 30 % deposit and 70 % against the bill of lading; FOB Shantou is the default term, EXW and CIF on request.

What We Do Not Do

We do not fill, formulate or design labels, and we do not hot-fill in standard PET above about 60 °C. We hold ISO 9001:2015 (PCC85724Q01277R1S), RoHS reports for PE and PET and an EU 10/2011 migration test — and we do not claim FDA, REACH or GRS certification we do not hold.

Frequently Asked

What is the MOQ for the 2.5 ml pack?

1,000 pcs per colour on existing moulds; a new shape needs tooling at about USD 850 and 15–20 days.

Which closure comes with it?

Screw cap with dropper. We test the closure on the pack before packing, because that is where leaks start.

Can I get a sample?

7 days from an existing mould. The sample comes from the production tool, not a showroom piece.

What documents do you provide?

ISO 9001:2015 (PCC85724Q01277R1S), RoHS reports for PE and PET, and an EU 10/2011 migration test. We do not claim FDA or REACH registration we do not hold.

Can the pack be decorated?

Silkscreen from 1,000 pcs, labels from a few hundred, spray coat and metallising from 3,000.

Related

Send the Spec, Get the Number

Capacity, neck, quantity — we come back with unit price, packing data and lead time.

Ask for a Quote →
QUOTE ✆
WhatsApp Get a Quote →